New road project in Eppertshausen: Construction work start on August 5th

New road project in Eppertshausen: Construction work start on August 5th

The upcoming construction work in Eppertshausen will not only change the traffic situation on site, but also have long -term effects on the infrastructure and quality of life of the residents. The renewal of the node of Haupt, Ober-Röder and Urberacher Straße goes beyond mere repairs and signals an important step in the development of the regional transport infrastructure.

effects on road traffic

From August 5th, Hessen Mobil begins with the comprehensive lane renewal of the Landesstraße 3095, and the work is expected to continue until February 2025. This will mean that drivers have to plan significantly more time for their trips, since the traffic is regulated on half -sides by traffic lights. Particularly noteworthy is the complete blocking of the level crossing on Urberacher Straße for motorized traffic throughout the entire construction period. Pedestrians and cyclists, on the other hand, continue to happen what is of great importance for residents and travelers.

Overview of the construction work

The entire construction measure includes a thorough renewal of the road to a depth of 60 centimeters, starting at number 95 and up to the petrol station in the area of Kettelerstrasse. The new paving channel will replace the existing gutters, while four traffic islands and all nine traffic light systems with the associated foundations in the construction site area are completely renewed.

extension and accessibility of the sidewalks

Another central element of the construction measure is the renewal of the sidewalks, which are not only widened to 2.50 meters, but should also offer barrier -free crossing points on the pedestrian transfers. This measure promotes accessibility for all road users and improves security for pedestrians, especially for people with restricted mobility.

costs and financing of the construction work

The total costs for the project amount to around 934,000 euros. The state of Hesse pays the majority of the costs of this with around 708,000 euros, while the municipality of Eppertshausen uses around 225,000 euros for the repair of the sidewalks. This shows the commitment of the community to improve the infrastructure and to increase the standard of living for the citizens.

long -term importance for the municipality

The basic renewal of traffic routes in Eppertshausen is not only a technical challenge, but also has far -reaching effects on the quality of life of residents and urban development. Improved traffic routing and accessible sidewalks could possibly bring new economic impulses and increase the attractiveness of the community for residents and visitors.

The construction work is not just a necessary evil, but an opportunity to make Eppertshausen future -proof. Local residents and commuters are called up to use the diversions and to understand the inconvenience during this time, since the improvements can have long -term positive effects for the entire community.

- Nag