Full closure in Ottmannshofen: Important street work from September

Full closure in Ottmannshofen: Important street work from September

In the tranquil Leutkirch, especially in the Ottmannshofen district, there are extensive street work. These measures begin on Monday, September 9, 2024, and bring comprehensive restrictions on local traffic. The passage through the town is expected to be completely blocked in several phases until December 20, 2024, which will bring some changes for residents and commuters.

The main reason for the full closures is the important redeployment and expansion of the main drinking water line. This work is crucial to improve the water supply in the region and bring the infrastructure up to date. At the same time, the digital future is also being worked on. In the course of the construction work, empty pipes for broadband expansion are laid to improve the internet connection in the region.

Details on the construction work

The projects are divided into two essential construction phases. The first section extends from September 9th to November 8th, 2024. Here, the K 7917, also known as Spitalriedstraße, is blocked from Ottmannshofen to the Redle carpentry from Leutkirch. This phase will be necessary in order to be able to cover the drinking water pipes safely without unnecessarily endangering traffic.

In the second construction phase, which takes place from November 9 to December 20, 2024, the K 7913, also known as Aichstetten-Hofs, is fully blocked in the area around the confluence with the Spitalriedstrasse. These bottlenecks require careful planning in order to make the traffic routing as smooth as possible during this time.

The diversions for traffic have already been determined. Cars and trucks are led by the surrounding towns of Wielazhofen, Leutkirch, as well as via Aichstetten and Altmannshofen. It is recommended to use the alternative route in the high phase of the construction work to avoid longer waiting times.

The measures in Ottmannshofen are part of a more comprehensive plan to modernize the infrastructure in the region. The combination of drinking water and broadband expansion is not only a need for current care, but also a step towards a better digital future and quality of life for the residents. These developments are particularly important with regard to the increasing requirements for powerful internet connections and reliable water supply.

The citizens of Ottmannshofen and the surrounding area are informed during the construction period about all important information about the progress of the work. The Memmingen Kurier will report the latest developments and changes in the traffic situation in the usual way to ensure transparent communication.